Sunday, August 5, 2012

Start Your Engines!

It's now March 4th, 2012 and we're now ready for the long awaited step of the first start for these engines.  Although we didn’t have one gauge quite hooked up yet (the transmission oil pressure gauge), all the things necessary for safely running the engines were in place and of course we were anxious to give it a try.  Besides Ray and me, our crew today included Erin and our friend Laura, who were also anxious to witness the event.  We arrived ahead of time, as I wanted some time to purge any air from the fuel lines before the first attempt.  We do this by activating the electric fuel pumps back near the tanks to pressurize the fuel system, and then slightly loosening a fitting at the injector pump until fuel escapes.  Diesel engines are notorious for being finicky about any air in the fuel and generally don’t start if that is the case.
 
  
Well, I had the pump on, but before crawling down there with wrench in hand I thought “why not push the button first, just to see what happens?”  What happened was the engine sprang to life in less than 2 seconds and continued to run just fine.  The instrument panel indicated it had plenty of oil pressure, and a quick check to the stern showed the cooling water was coming out the exhaust.  We let it run for 10 or 15 minutes, checking for any loose fittings and leaks.  I cycled the transmission briefly into forward and reverse to route some ATF into the cooler and was very glad that the boat wanted to go forward when the lever was forward, and wanted to go backward when the lever was in reverse.

The Captain is happy with the first engine starts

Our plan was to run just one engine at a time so that if there were any weird noises or events we’d know from whence they came.  Next came the attempt to start the port engine.  It sprang to life in similar fashion, taking maybe a whole 3 seconds to fire up.  Laura pointed out we had a leak, and looking down the doorway from the bridge I saw that it was the valve on the intercooler that was open, spouting out some coolant.  That was a really easy fix!  The raw cooling water was also exiting through the exhaust for the port engine, so we were in business.

 This all happened before our 1:00 o’clock scheduled start time, and one more witness arrived just after we shut off the port engine.  Randy Rice, another tenant who had repowered his boat with these same model engines, came to see how we were doing.  We confessed to jumping the gun, but started them again to show off.  I had brought my infrared spot thermometer, and Randy checked the surface temperature of various parts of each engine to see if there were any hot spots.  All was fine in that department.  We ran each one for probably another 10 or 15 minutes and, although the water temperature gauges did come off the peg they didn’t warm up to the point that I think the thermostats would open.  I think the coolant temperature got up to a reading of around 130/140 degrees during that time – it may take having them under load to reach a real operating temperature.

  The transmission coolers took on enough fluid that we had to top up the transmission again, which we expected to do, and we found one slight leak in the raw water system on the port side.  We may have to redo one joint in our PVC plumbing there.  There was also a puff of exhaust from the port side upon startup, and I could smell some exhaust so we'll be checking connections there as well once things cool off.  All in all we’re very pleased with today’s results. 
 We still have plenty to do, both to finish off the install and of course to put the boat back together – but this has been a milestone day for sure!  We officially anointed the keys by putting them on the Chris Craft Rendezvous key fobs we acquired back in 1991 when we stumbled into our first Chris Craft Rendezvous in Port Orchard in the Free Spirit.




Making Connections

The day our engines arrived Ray and I were working on removing the mechanical fuel shut-off cables that were used to turn off the Perkins engines.  We understood that the Cummins had an electrical fuel shut-off for turning off the engines, so these wouldn't be needed.  We stopped to watch the engines being unloaded, and looking at the fuel injector pumps we noticed two control levers, not one.  Although there was an electric solenoid shut-off, there was also a mechanical lever.  We hadn't pulled those control cables out completely, so just put them back where they were. 

The cables came over the front of the engines on the Perkins, while the Cummins brackets were designed for the cables to come from the rear.  We weren't sure if our cable length would work or not, but with a lazy S route under the engines it turned out just right.  We were short by one double cable housing clip, and that thing was nearly $20.  After a few fruitless excursions to the Second Wave marine consignment store and some forays on Ebay I conceded defeat and bought one at Fisheries. We needed a longer bracket to accommodate the length from the end of the cable housing to the connector, so Ray fashioned a pair of those in his shop.  We also removed the control levers for the fuel shut-off so Ray could weld on an offset extension for a better connection.  We ended up with this nice looking installation.
The boat has exhaust pipes running from the engine room all the way back to the stern – these pipes are in excellent shape, as we replaced them a few years back with fiberglass and hose connecters.  The new engines have exhaust water injection elbows which we need to connect to these existing exhaust pipes.  The new elbows are 5” in diameter, while the boat’s exhaust system is 4.5” in diameter, so some adjustment is necessary.  There are some commercially made “reducers” available, but the only ones we saw are straight, which would introduce some complications with a bit too much length.  Also, it would then require purchasing a couple of additional 5” elbows to route the exhaust from the engine to the pipes.  We decided we would build our own reducers, by enlarging one end of the existing 4.5” elbows we have now.  I purchased a one foot section of 5” fiberglass pipe that we could cut in two to make our modifications.  As I was hoping, the store had a 3’ long remnant and just handed that over for the price of 1’ – a little extra material in case we need it.

  We also purchased a quart can of fiberglass resin and a small bottle of catalyst, as well as about 10’ of 4” wide fiberglass cloth.  With one end of our 4 1/2" elbow cleaned and sanded, Ray added an O ring he made from some tubing to prevent the resin from running down the elbow.  Our plan was to wrap the fiberglass cloth around one end of our elbow to bring its diameter up to where the 5” extension would just fit over it.  The directions for the resin/catalyst ratio were for a full quart, way more than we needed, so we used syringes to extract 4 oz. of resin and 3 or 4 ml of catalyst.  The syringe used for the catalyst scaled down to only 5 ml, so that was a bit of a guess, plus the ratio changes quite a bit with the ambient room temperature.

 We decided about 3 wraps around the cylinder would be about right, cut off the proper length of cloth, mixed our resin and went right to work, as we knew we’d have a limited working life with the resin.  We were just finishing up the 3rd wrap when the remainder, about half of what we started with, solidified in our cup.  It quickly generated enough heat that we couldn’t hold it by the bottom – we set it outside away from the house just in case it was going to burst into flame.  It didn’t.  When the cloth set up we tried the 5” tube over it and decided a couple more wraps would make for a good tight fit.  With our next session working with the resin we used a bit less catalyst, applied the extra wraps and overlaid the 5” tube onto the piece just before we had our next lump of solid leftover resin.  We had used most of the 10’ of cloth, so purchased some more for the second elbow.  With even less catalyst this time, we got the entire wrap plus the 5” tube on the second elbow in one session.  Our new elbows provided for the 90 degree turn to the bulkhead on each side, as well as the reduction in diameter.

   

On the deck you can see the old 4.5" plug that kept water from entering the boat while the exhaust is disconnected, and clamped to our new reducer elbow via a length of hose is the new 5" wood plug that serves the same purpose.  Both sets of plugs will remain on the boat in case they're needed during some future exhaust work.





Some of you may be wondering what the heck we’re doing using fiberglass for exhaust piping.  Although the exhaust directly out of the engine can run up to 850 degrees, this is quickly cooled when the raw cooling water is injected into the exhaust at the water injection elbow.  This is now a common material to use for marine water-cooled exhaust – much cheaper than copper (the previous pipes on the Potentate) or even hose, and with a much longer lifespan.


I had also purchased some 5" diameter stainless steel exhaust elbows on Ebay, thinking they would come in handy for routing the exhaust from the engine.  Using one of the stainless elbows and short lengths of hose for connecting, I hooked up the starboard exhaust from the water injection elbow all the way to the bulkhead.  I didn't like the looks of it at all.  It just didn't look like very much slope.  The raw water used for cooling exits through the exhaust, and with this slight of a slope I was concerned that water could backwash up the exhaust into the engine if the boat were rocked the wrong way.  This would be a very bad thing, especially with salt water. 
I did some research and read somewhere that the exhaust elbow should be at least 12" above the waterline.  By sighting a nearby thru-hull fitting from the outside and inside we estimated that we had just around half that elevation.  I took the connection apart and put the wooden plug back in.  We took a trip to Broomfield's Marine Exhaust in Ballard to see what sort of riser might be available.  He had a couple of 90 degree elbows designed for Cummins, and we borrowed those to better estimate what we'd need.  I bolted them together with a 90 degree offset, then clamped on our exhaust elbow with some vicegrips for a visualization. 

We could see that we could do another two or three inches of elevation, and that we'd also need the riser to extend away from the turbocharger another 3 inches so as to clear the raw water outlet pipe from the heat exchanger.  We ordered two risers made from elbows with a straight piece welded in.  They were ready in a week or so.  I put them in the trunk and made the next stop at Ballard Insulation, where I had heat shields made for them.  These aren't water cooled, so can get up to 800 degrees depending on the load on the engines.  The small threaded fittings are for the pyrometer sensors.  These riser were not cheap, but are a lot less expensive than having salt water inside your engine.

We also got some pieces of high temperature gasket material while at Broomfield's, and Ray cut out a couple of gaskets for the risers with his scroll saw.  Here they are sandwiched between a couple pieces of wood to prevent the material from fraying.



In yet more Ebay shopping I had acquired a box of stainless steel T-bar clamps and a couple of high temp silicone exhaust hose couplings, so we were ready to assemble our exhaust system and see how it all fit together.  We had the steel exhaust gaskets that came with the engines, and we used those between the turbochargers and the new risers.  The gaskets Ray made we used between the risers and the water injection elbows. 
We put a thin layer of white lithium grease on the joining surfaces as well.  I had learned earlier from Broomfield's how that helps with the seal while we were working on the Perkins exhaust system.  The extra 2 feet of 5" fiberglass pipe we had was just the right length for the port side run from the injection elbow to our newly made reduction elbow.  The insulating pads are held on with stainless steel wire, laced together not unlike a boot. 

We found it was easier to put the pads on before connecting the raw water hose from the heat exchanger to the elbow.  The starboard side went together in a similar fashion, with a shorter run to the reduction elbow.  The hose from the heat exchanger to the elbow is wire reinforced, and also repurposed.  It's from sections of the hose I removed from the raw water through-hull fittings to the engines and replaced with new.



In between our steps of getting the exhaust parts fabricated and aligned to our satisfaction, we’ve also been doing some other necessary stuff, like connecting fuel input and return lines, raw water hose, battery cables, painting the new stringer blocks, filling the engines with coolant (the coolant that was in the engines didn’t have much anti-freeze in it – a result of having engines shipped up from Florida!), and reinstalling the boat’s hot water tank, which is now plumbed into the starboard engine’s coolant system for heating our water while cruising.  The tank fit back in its original spot, with about an inch or two of clearance from the starboard engine’s crankshaft pulley.  

  Despite all that we’ve done to date it seems like there’s just as much stuff left to do as ever, but we’ll eventually be to the point where we’re ready to turn the key(s) and push start(s) to see what happens.  After that comes another list of tasks, including fixing that big hole in the ceiling!

We have been enjoying our short work days, with equal amounts of pondering to go with the actual work – and with occasional lunch breaks at Voula’s or the Salmon Bay CafĂ© as well.
   

In the photo above you can also see the raw water pump below the control cables, with no pipe attached.  Sea water is pumped through a heat exchanger to cool the engine’s coolant, similar to a radiator cooling a car engine – we just use water instead of air blowing through the grill.  In addition to the engine coolant, we also have to cool the transmission fluid and reduction gear oil as well.  The engines came equipped with transmission coolers, but we opted to use the old ones that cooled the transmissions when the Perkins were driving them.  They are larger and serviceable – Ray had previously disassembled and cleaned them, so they were ready for duty.
 
With the additional circuit for cooling the reduction gear, we had some rerouting to do on the raw water plumbing.  In addition, one of the pipes that came attached to the starboard engine’s raw water pump was smaller than the port side, as well as a bit shopworn.  The pipe on the other engine was PVC, and we decided to go that route on the starboard side as well.  We acquired some various universal flex hose lengths at an auto supply store, as well as a couple of preformed elbows that were 1 ¾ inches in diameter – the size needed to fit onto the transmission and gear coolers.  The outside diameter of the PVC pipe is an odd size not intended for clamping hose to – so we fixed that by getting some PVC couplers, which Ray cut in half and turned down to the proper outside diameter on his lathe.  He also formed a ridge at one end to better hold the hose. 

Once we cut the PVC sections to the proper length we used PVC cement to attach and bond our custom fittings to the ends of the pipe.  The raw water is now routed across the back of the engine under the turbocharger into the transmission cooler, then to the reduction gear box (which has its own water jacket), and from there to the heat exchanger, where it cools the engine’s internal coolant.  From there the raw water is injected into the exhaust elbow coming out of the turbocharger where it cools the exhaust and then exits with the exhaust out through the transom.

With the plumbing completed we turned our attention to the electrical connections.  Earlier I mentioned that I had located and acquired a pair of brand new Cummins gauge panels complete with 30’ wiring harnesses.  Ray had made a new mahogany panel from an old cabinet door of mine that I’d set aside nearly 40 years ago for this purpose, and I augmented the gauge set with additional VDO gauges for turbo boost, pyrometer (exhaust temp) and transmission pressure.  We installed these on the helm a few months ago, but we’re now ready to make the connections to light them up.

The turbo/boost gauge is mechanical – no sending unit, just a small air hose from the intake manifold is all that’s needed to actuate it.  I had a length of plastic hose left over from repairing the ice maker connection some time ago, and Ray had a length of similar sized hose that he’d previously used for compressed air in his shop.  With that supply and some compression fittings we were able to make connections, thread the hoses through the rear bulkhead and up the closet wall to the gauge panel. 

Next came the pyrometer gauge.  When we had the exhaust risers fabricated we had a threaded hole put in each one, to which we could insert a temperature sensor.  This sensor can detect temperatures up to 1500 degrees, although the exhaust coming directly from the turbocharger should never exceed about 850 degrees at wide open throttle.  The sensor has an electrical pigtail which attaches to a length of double wire that we also routed through the firewall and up to the helm.  These additional gauges are also illuminated, as are the original panel gauges.  We tapped into the power and ground connections of one of those gauges to connect the lights of the new gauges.  The gauges have small clear bulbs, but also came with green and red sleeves which could be put over the bulbs.  I used the red to match the other gauges.  The transmission oil pressure gauges we’ll hook up later, using a pair of unused wires that are in the harness.


Once this was done we decided to turn on the battery switch for each engine so we could turn on the ignition key to see if all the lights worked and if the gauge needles would set to zero.  I was at the helm and Ray was in the engine room to flip the switch.  He did starboard first, and the engine started cranking, even though the key was off and I definitely wasn’t leaning on the starter button.  That was a bit unexpected and exciting, but Ray turned it back off pronto.  I thought something must be messed up between the gauge panel and the wiring harness, so we disconnected the gauge panel completely from the engine and tried it again – with the same result.  We left starboard off and turned our attention to the port side.  We did not get that result there, which was a bit reassuring.  No sounds, smoke or smells occurred when the battery switch was powered on, and when I turned on the key for the port engine all the gauges lit up, and the low oil pressure light came on, as well as the warning buzzer.

We were about to leave the starboard snafu for the next day when we encountered Randy Rice as we were leaving.  He is another tenant at the marina who repowered his boat several years ago using these same model engines.  He came to take a look at it, and surmised that maybe one of the wires from the relay below the starter was crossed up.  He disconnected it, then did some testing with my voltmeter at several contacts.  All was as it should have been, and the wire he disconnected had belonged where it was.  He put it back to the same terminal; we turned on the battery switch and … nothing.  It behaved itself and when I subsequently turned on the key for the starboard engine the gauges lit up, the buzzer sounded, etc.  A light tap of the starter button engaged the starter so all seemed okay.  We could only surmise that the load of spray paint that was put on the engine after it was rebuilt had somehow been conductive, or something was making contact that resolved itself with the removal and replacement of that wire.  We weren’t quite ready to start the engines then – still haven’t opened the seacocks for the raw water inlet and there are some additional witnesses who may want to see what happens when we turn the key for real.

Saturday, August 4, 2012

Engine Mounts & Alignment

Although we’re doing a lot of the work ourselves getting these new engines in and hooked up, there are a few things we’re leaving to folks who know what they’re doing – one of those is placing the engine mounts and aligning the engines to the shafts.  This is the most critical step of the entire process, as misalignment can cause havoc with the shaft journals and packings, gearboxes and transmissions.  Although we’re keeping our original transmissions in place, the mounts that hold them have become worn and misshapen over the past 40 years so we’ll be replacing those mounts as well.  The bolts coming out of the old mounts are no longer straight, which would make it very difficult to do a proper alignment, as tightening the hold-down nuts would skew the engine or transmission.



The new mounts are just like the old ones – a casting with a hard rubber vibration dampening piece and a mounting bolt, except these are straight.  







Attached to the transmissions on either side are brackets that come out to meet the engine mounts, which are placed on the boat’s stringers.  These brackets have a solid metal rod about an inch in diameter than can slide laterally inside a sleeve for adjustment – except they were all frozen solid in the position they were set so many years ago. 





Jorgen, the mechanic, was able to free them up by getting them red hot with a torch, followed by some ambitious pounding with a very heavy hammer.  He then sand blasted them, honed out the sleeves and gave them a new coat of paint with the paint I had used on the transmissions.  They’re now back in place holding up the transmissions and the rear of the engines.

   


The front of the engine also has brackets that come out to meet the motor mounts, but the ones supplied with the engines are not long enough to meet the boat’s stringers squarely.  Those will either be modified or just replaced with custom made ones – Here Jorgen is sawing up some pieces of steel for making some new ones.





 
 

Removing the front brackets for modification/replacement requires that the engine be supported – an A frame and beam setup is in the boat for supporting the engines while those brackets are removed.






The new and longer front brackets were welded, drilled and given a coat of paint.  These will support the front of the engines.







 
The new front motor mounts needed to be mounted a bit higher than they were for the Perkins, and rather than add another short spacer to the existing block that was its support, we are making new blocks.  Irv ordered a length of 4 x 12 clear fir timber, which will be used for that purpose.  There are already notches in the stringers where the existing blocks are mounted, so those will be removed and new, taller ones will go in their place.  They will be lag bolted to the stringers, and the motor mounts in turn will be lag bolted to the blocks.  In this case, a few pictures are worth many words.





 

Here the old support block has been removed, and the lag bolt holes have been drilled and filled with dowels in preparation for mounting a new block.







In this photo the new support block has been lag bolted to the stringer.  The bolt holes were counter-bored so the bolt heads would not be in the way.  The motor mount is set on top of the support block, and will be lag bolted into place as part of the engine alignment process.



All is bolted into place here, and the support block and sealant have a couple coats of gray paint to finish them off.  The motor mount on the other side of this engine can also be seen in this photo.






We had quite a bit of that clear fir timber left over, and it's now in Ray's basement for use in some future woodworking project.

With the engines secure, we continued with our tasks of connecting things, working towards engine startup.  Our work days consist mostly of 2 or 3 hours, 3 or 4 days a week - we decided that any more than that it would seem too much like work!

Engine Installation

This step has been delayed by worker injuries and illness, as well as another boat that needed way more work than planned before it could get out of the lift and out of our way, but today (Sept. 8) our new engines were placed in the boat.  They were fitted onto the spline shaft coming out of the transmission and bolted into place to the transmission flange.  The fronts of the engines are temporarily resting on wooden blocks atop the main stringers.  They will stay that way for a couple weeks while the boat does any flexing to accommodate their weight.  I’m sure it won’t be much, but the tolerance for aligning the engines with the propeller shafts is only .003 inch, so we want the wood to be where it’s going to stay before installing the front engine mounts and making those adjustments.

Here the crane picks up the first engine, for the port side.  The engines are mostly identical, but the dipstick location on this engine allows the oil to be checked from the front, while the dipstick on the other engine will be situated to be checked from the center aisle way.  We'll need this engine located to port so we have access to the dipstick.





The port engine is lowered through the roof.  Sealing this hatch and making it disappear with epoxy, sanding and a paint job is just one of the many tasks ahead of us.  This section of the boat hasn’t been washed since we opened the hatch in June, and several layers of I-5 freeway dust have accumulated.

  

Once through the hatch, the engine is rotated 90 degrees to line up with its new home.  Here the engine is hovering in the main salon, and both the lifting crane and Ray can be seen in the reflection in the window.








Jorgen aligns the bell housing to the transmission plate before the engine is lowered into place.












 
Once close to being in place, the engine is lowered manually with the come-along until it is in alignment with the transmission flange and spline shaft.






 
The engine is then moved back an inch or so while being rocked, until it slips onto the spline.  We purchased adapter plates earlier that match the transmission and bolted them to the flywheel.  These plates are similar to a clutch plate in a car, but they allow for up to 10 degrees of flex – this is especially important as its easier on the transmission when engaging the gears, and we’re using our original, 40 year old transmissions.

 
With the weight still supported by the crane, the mechanic bolts the rear of the engine onto the flange.  There are 12 bolts in a circle around the engine’s bell housing.  Measurements are then taken of the distance from the front engine mounting wing down to the stringer and a wooden block is cut to place there.  Then the weight is transferred to the boat and the cable and chains are lifted out to go pick up the other engine.

  
The entire process is repeated for the Starboard engine.











































Looking into the engine room from the galley, it’s apparent there will be quite a bit more elbow room.  Even though the crankshaft is at the same elevation as the old engines, aligned with the transmissions, there is a lot more clearance under these engines and the mounts are higher.  New front motor mounts will be fashioned and welded so that they fully engage the stringers.  Until then, the engines will rest on the temporary blocks while the boat stretches to accommodate their weight.

Once both engines were secure, the two mechanics poled and walked the boat back around the dock to our moorage.  Note the cut out roof hatch is still on the foredeck. 

There are so many things to do and connect before these engines are ready to go that I’ve made a list, and I’ll even have to check it twice as tasks are completed for each engine.  Even though the motor mounts aren’t there yet, we can now proceed with connecting fuel and water lines, electrical connections, exhaust hoses and so forth.  It’s the ‘so forth’ that’ll probably get us!